DB14-WASD-05

Florida Pipeline Company has teamed with the top design build firms in the state of Florida in pursuit of the Miami Dade Water and Sewer Design build contract DB14-WASD-05. We are very familiar with this project and have been following it for a long time. Project consist of the installation of a 48″ Force Main  running along North Miami Avenue from NW 8 Street to NW 36 street. The force main continues along 36 street from North Miami Ave to NE 2 Ave. The estimated cost for this project is around 21 million dollars.

Project qualifications are significant. The lead designer and contractor must have installed over 10,000 LF of 42″ force mains in the last 10 years.

 

Leave a reply